資料集
-
Daily Job Running Time by Operator
By New Anglia Labels Limited
An XPS file pulled straight off Labeltraxx that breaks down the running time of each job, per phase (make ready, run, wash up), per operator; as well as the material used on... -
Estimated vs Actual Material used per job
By New Anglia Labels Limited
This is the first data pulled from the live LabelTraxx system tracking the difference between the estimated amount of material that should be needed for each job versus the...